Skip to content
Toll stations and prices

The toll station in Finnfast has payment for passings in both directions.

Vehicles under 3.5 tons

Petrol/plug-in hybrids/diesel

84.80

Zero-emission vehicles

42.40

Petrol/plug-in hybrids/diesel

106.00

Zero-emission vehicles

106.00

Special exceptions

Tractors will be charged as a light vehicle provided that it is registered to a valid AutoPass agreement.

Zero-emission vehicles

Zero-emission vehicles are defined as electric vehicles and hydrogen vehicles in rate group 1 and rate group 2. To obtain discount or, in some cases, an exemption there must be a valid AutoPass agreement connected to the vehicle. Zero-emission vehicles in rate group 1 will be charged toll rates that corresponds to 50% of ordinary rates after the discount is added. There will be no charge for passings with zero-emission vehicles in rate group 2 for the time being.

Create agreement
About

Finnfast is the name of the road project with the mainland connection to Finnøy municipality, to the north of Stavanger in Rogaland.

The project involved building a undersea road tunnel, and since Rennesøy had gotten a mainland connection in 1992 in the form of Rennfast, Finnøytunnelen was built from the island of Rennesøy to Finnøy with an intersection and separate road in the tunnel leading to Talgje.

Finnfast opened on 30 October 2009.